Completed Projects
LIBRA (Livelihood Improvement through Biomass in Rural Areas): Phase 1
October 1, 2002 to
January 31, 2004
Integrated solar housing complex at New Town Kolkata for WBREDA (West Bengal Renewable Energy Development Agency)
July 1, 2003 to
January 29, 2004
Air quality monitoring and awareness building programme for schools
October 1, 2002 to
January 13, 2004
Exposure to indoor air pollution for a pilot study on 'Epidemiology of age-related macular degeneration in India'
July 1, 2002 to
December 26, 2003
Design, development, and testing of low temperature solar desalination system
March 1, 2000 to
December 24, 2003
@ Develop a prototype of low-temperature multi-stage stack desalination system for rural and industrial application@ Fabricate and test the prototype unit after carrying out computer simulation
Validation of electricity demand projection
September 25, 2003 to
December 24, 2003
To make an assessment of electricity demand by consumer category in the State of Maharashtra, both in the medium and long-run [10th(2006-07) and 11th(2011-12) Plan periods respectively]. The assessment of demand in the short, medium and long run is an essential part of the planning process in the electricity sector. The short-run demand projection is the basis for scheduling load, maintenance programs, etc. The medium & long-run forecast, on the other hand, is used for capacity planning and strengthening of the T&D network.