Energy audit study of 6th unit (1 x 110 MW) of The Durgapur Projects Ltd
November 1, 2008 to
June 30, 2009
To carry out a comprehensive energy audit study of the Durgapur Projects Limited with the following specific objectives: 1/ To carry out a detailed performance evaluation of major equipments and auxiliaries in the power plant with a view to identify thrust areas for energy conservation. 2/ To quantify the extent of energy savings/performance improvement that can be achieved. 3/ To recommend various technically sound and economically viable measures to improve the end-use energy efficiency.Clean cookstoves check black carbon
September 1, 2009 to
June 29, 2009
The objectives of the project are:- To introduce cleaner-cooking technologies and enable its wider access;
- To gather data on climate change and health outcomes;
- To use the data to scale up and expand the project.
Study of Energy Conservation Option in Spencer Retail Stores (Phase I)
<br>
December 10, 2007 to
June 27, 2009
The study covers the evaluation of refrigeration & air conditioning and lighting systems of the retail stores. The results of the study would be useful to identify energy saving opportunities and would also help to target the areas for a detailed energy audit.Third party independent groundwater resources assessment of Pepsico India Holdings operations in Palakkad, Kerala
January 11, 2008 to
June 24, 2009
The general objective of the project was to undertake an independent assessment on whether the utilization of groundwater by M/s PepsiCo India Holdings Pvt. Ltd, is affecting the water sources of the people of Pudussery Panchayat. The study had the following three specific objectives:(a) whether groundwater extraction by M/s PepsiCo India Holdings Ltd. is depleting the water resources of the Pudussery Panchayat;
(b) whether there is a deterioration in the quality of groundwater due to PepsiCo¿s operations; and
Site-Wide Energy System Assessment and Plan - Universal Enterprises Pvt Ltd, Maldives
February 24, 2009 to
June 22, 2009
Objective of the project is to undetake cleaner production audit and design review of the four island resorts of Universal Enterprises Pvt Ltd, i.e., Kurumba, Huvafanfushi, Kuramathi Village, and Laguna in Maldives.Adaptation and mitigation strategies: supporting European climate policy case study
March 22, 2006 to
June 20, 2009
The objectives of this project include 1. To develop portfolios of policy options that could provide the basis of a post-2012 climate governance architecture 2. To organise these options, as well as other current and future proposals on the post-2012 climate governance architecture, in an innovative matrix that is structured along the dimensions of climate polity (the overall governance structure), climate policy (actual policies to be negotiated and agreed upon), and climate politics (including negotiation strategies to be pursued by the EU) 3.Facility Water Audit of select unit of Dabur India Limited to identify water conservation measures
June 10, 2008 to
June 20, 2009
1. To develop a water balance of individual process units for one cycle of plant operations 2. To identify the leakage within the water distribution system 3. To develop a water utilisation plan with regard to water use and reuseSetting up of a test project on Village Energy Security at village Jambupani, Distt. Burhanpur of Madhya Pradesh
September 1, 2006 to
June 19, 2009
Setting up of a test project on village energy security at village Jambupani, District Burhanpur, Madhya Pradesh, for electrification of village Jambupani on decentralised basis power generation. The project includes 2 Nos.of 10 kWe capacity biomass gasifier with 100% producer gas engine, biogas plants inclusive of all accessories and civil works and 97 Nos. of TERI model cook stoves.Evaluation of GOAL INDIA''''''''s WATSAN Programme in Schools of Kolkatta and neighbouring districts in West Bengal
December 8, 2008 to
June 17, 2009
The project aims at evaluating the programme of GOAL India whereby WATSAN facilities have been provided to 375 schools that are situated in difficult circumstancse in Kolkatta and neighbouring districts. The main objectives of the study are to : -- Assess the impact of the programme on school enrolment attendance and retention
- Analyse the appropriateness of the school selection criteria
- Evaluate the O&M of the facilities provided under the project
- Provide recommendations for further improvement of the programme