Workshop on Ceaner Liquid Fuel and Improved Vehicular Technology

March 2, 2011 to June 22, 2011
| Completed Project

This workshop would include a brief discussion on the developments so far on the improved fuel quality and vehicular technologies, and need for a future road map for continual improvement.

GRIHA Rating: Construction of Hall of Residence for girls, IIT Kanpur

March 1, 2011 to December 31, 2016
| Completed Project

The proposed building has an area of 6311 m2. It is coming up in Indian Institute of Technology, Kanpur, Uttar Pradesh. It is a 6 storied hostel building consisting of 164 double seated rooms. The ground floor consists of parking and Warden / Caretaker and office rooms. It has two lifts, each with a capacity to carry 8 people.

Clean Energy Solutions

March 1, 2011 to December 31, 2016
| Completed Project

In order to make the two stage biomass gasifier more effective, further improvements are needed in the technology as well in related aspects like the establishment of reliable biomass fuel supply chain for gasifier systems. The thermal gasifier too needs further modifications in order to accelerate its uptake among MSMEs. In particular, the following issues need to be addressed:

Urban Peri-Urban Energy Access (UPEA), Phase-III: Policy Synthesis Report

March 1, 2011 to July 19, 2013
| Completed Project

The aim of UPEA-III (Urban Peri-urban Energy Access) is to build upon and take forward the work done in UPEA-I and II. This phase will focus on recommending policy and other measures to operationalize solutions to improve energy access for the urban poor in the areas where UPEA-II research was carried out. The specific taks to be performed are as follows:

Testing and long-term performance evaluation of SPV lighting systems

March 1, 2011 to June 23, 2014
| Completed Project

The Ministry of New and Renewable Energy (MNRE), GoI has sanctioned funds to TERI for carrying out long-term performance evaluation and development of new designs of Solar Lighting Systems in TERI's Solar Lighting Laboratory located in the TERI University campus.

Indian Renewable Energy Market Report

February 28, 2011 to May 9, 2011
| Completed Project

TERI is carrying out a comprehensive study of the Indian renewable energy market in two major technologies, viz. solar PV and onshore wind energy. The study will focus on 4 specific states of India that have the potential to develop into major renewable energy development hubs for clean energy investors. This study has been commissioned by Clean Energy Partners (BNP Paribas).

Due diligence of wind power project in Maharashtra

February 18, 2011 to September 24, 2012
| Completed Project

Due diligence activity involves the independent assessment of the energy generation estimation from the 25 MW wind power project in a proposed site using WAsP. The input data of site wind conditions, contour, roughness, wind turbine locations and the wind turbine characteristics have been used for annual energy generation estimation from wind farm.

Determination of tariff for the year 2011-12 of RVUN and Annual Performance review of the previous years

February 17, 2011 to October 27, 2011
| Completed Project

Determination of ARR of the 6 power plants of RVUN for 2011-12 and annual performance review of the previous years. this would involve computation of each parameter of ARR for FY 2011-12 and 2012-13 and carrying out a revise of the ARR components considered in the previous years.

Pilot project to support Common Service Centers through partnership between Centre for Development of Advanced Computing and TERI’s Lighting a Billion Lives©a

February 10, 2011 to March 16, 2012
| Completed Project

TERI and Center for Development of Advanced Computing (CDAC) are joining hands to support Common Service Centres (CSCs) through implementation of Lighting a Billion Lives(c)a in Jammu & Kashmir, Madhya Pradesh and Uttar Pradesh.

Study on Potential Areas of Technological Collaboration between India and Japan and Identification of Key Barriers to Enhanced Technology Transfer

January 14, 2011 to March 13, 2011
| Completed Project

TERI in partnership with Mitsubishi UFJ Morgan Stanley Securities Co., Ltd. (MUMSS) has engaged in a project with the aim to accelerate cooperative activities involving introduction of new technologies, between India and Japan towards promoting the uptake of low-carbon technologies.