Projects
Recommendations for Norway''s entry into CDM in India
June 1, 2007 to August 14, 2007
| Completed Project
The primary objective of this project was to understand and gain knowledge on the activities of other Annex I countries'' and other agencies (WB, ADB and their carbon funds) on CDM in India and suggest recommendations for Norway to plan its approach on CDM in India.
Upgrading the (CETP) common effluent treatment plant operation at Bithuja
May 30, 2007 to January 1, 1970
| Completed Project
The study aims at providing consultancy for connecting additional washing units to the existing 30 MLD (million litres per day) combined effluent treatment plant at Bithuja. The scope of work includes: preparation of feasibility report, preparation of tender documents for pumping station and wastewater conveyance system,
National Strategy on Climate Change in India
May 28, 2007 to November 30, 2007
| Completed Project
To design a National Strategy on Climate Change and it integration in the planning process of the country. The projects seeks to address the policies and programmes implemented by the govenment having strong mitigation and adaptation benefits, and suggesting a pathway for future.
Climate Resilient Development and Adaptation: India
May 21, 2007 to January 31, 2008
| Completed Project
This project includes development of a GEF/ UNDP FSP project fostering launch of an integrated program of pilot implementation, documentation, and capacity activities designed to support adaptation to climate change. The approach will develop strategies for responding to a combination of gradual change and the extreme climatic events anticipated as a result of climate change.
Green Design consultancy for Bellad Hubli project
May 15, 2007 to January 29, 2010
| Completed Project
The objective of the project is to provide consultancy on maximizing energy efficiency, water efficiency and various other aspects of green building for the proposed residence of Mr. Arvind Bellad in Hubli, Karnataka.
Evaluation of Uttam Urja REEEP project
May 8, 2007 to June 30, 2008
| Completed Project
To report present status of Uttam Urja since withrawl of TERI/REEEP from project area.
Techno-feasibility study of drill-cutting bioremediation at drilling installations of Cairn India
May 3, 2007 to October 8, 2008
| Completed Project
TERI carried out a pilot study with CEIL to determine the feasibility of bioremediation of drill cutting and was able to bring down the hydrocarbon level below the permissible limits.
Area wide Environmental Quality Management Plan for limestone mines in Karnataka
May 1, 2007 to December 31, 2009
| Completed Project
The main aim of the project is to conduct a comprehensive EIA and EMP study of the mining area to identify and analyse the impact of mining on the environment and devise strategies to mitigate the adverse environmental and social impacts.
Sunfeast Hara Banao Campaign
May 1, 2007 to March 12, 2009
| Completed Project
An awareness programme on Climate Change, the Sunfeast Hara Banao campaign reaches out to 550 schools in 10 cities. Through teacher training workshops and a host of teaching aids such as a film, posters, fact sheets and interesting project ideas, awareness on the issue is being created among students between Std III - VIII in each of the project schools.
Sustainable development pathways
May 1, 2007 to April 11, 2008
| Completed Project
The report “Sustainable Development pathways for South Asia” would focus on the environmental pressures associated with four issues, important for the sustainability of development efforts in the region: food security, water security, energy security and sustainable urbanisation.