Completed Projects
Estimation of Technical and Commercial Losses in NPCL Supply Area 2006-07 Conditions
September 17, 2007 to
October 10, 2008
The study is aimed to estimate voltage wise total and disaggregated distribution losses of NPCL network at 33kV and below voltage level corresponding to peak load conditions (2006-07)Techno-feasibility study of drill-cutting bioremediation at drilling installations of Cairn India
May 3, 2007 to
October 8, 2008
TERI carried out a pilot study with CEIL to determine the feasibility of bioremediation of drill cutting and was able to bring down the hydrocarbon level below the permissible limits. Based on the initial lab results and a pilot scale field trials in the CEIL drill site, this proposal intend to upscale the study with a larger volume of wastes (drill cuttings) and propose to TERI to determine the techno-commercial feasibility of bioremediation of drill cuttings/ oil contaminated wastes that will be generated from exploration and production operations.RSC-C80095 (IND): Loans 1803-IND: Gujarat Power Sector Development & 1868-IND:MP Power sector Development (KR) AND (SH) RSC-C80096 (IND): Loans 1804-IND: Gujarat & 1869-IND:MP
March 3, 2008 to
September 30, 2008
RSC-C80095 (IND): Loans 1803-IND: Gujarat Power Sector Development & 1868-IND:MP Power sector Development (Mr K Ramanathan) AND RSC-C80096 (IND): Loans 1804-IND: Gujarat Power Sector Development & 1869-IND:MP Power sector Development (Mr Shahid Hasan)Training course on CDM projects under LULUCF
July 1, 2008 to
September 30, 2008
One week training course for Indian Forest Service Officers on "Clean Development Mechanism Projects under Land Use, Land Use Change and Forestry:Theory and practice and their relevance to forestry sector", August 25-29, 2008 at TERI. The objectives of the course are: 1. To familiarize the participants with the science of global warming, global response to climate change, role of Land Use, Land Use Change and Forestry (LULUCF) in mitigation of climate change. 2. Training on forestry projects under clean development mechanism, project cycle, development of project design document. 3.Rajiv Gandhi Akshay Urja Diwas-2008
July 14, 2008 to
September 30, 2008
To commemorate Rajiv Gandhi Akshay Urja Diwas, TERI in partnership with Ministry of New and Renewable Energy sources would like to organise a series of events for school children and youth culminating on the Akshay Urja Diwas.These events would involve school children and youth from all over National Capital Territory and would be based on the common theme, “Akshay Urja ko banaye Manav pragati ka adhar”
Feasibility study for setting up INSTEP Centre at HP Hamara Pump in Amethi sub division, Sultanpur district, U.P
December 25, 2006 to
September 22, 2008
Training Programme for IAS officers on Regulation and reforms in Infrastructure sectors, 2008
September 1, 2008 to
September 12, 2008
To educate in-service IAS officers on various aspects of regulation and reforms in the infrastructure sectorWorld Wetland Day Celebrations
December 10, 2006 to
August 31, 2008
This is a collaborative project with MoEF for celebrating World Wetlands Day, on 2nd Feb, 2007.The project activities aim to generate a broader awareness amongst the society, on the need for conservation of wetlands, and the role that these play in providing several environmental services for our well being.
The activities will include organising a painting competition amongst the school children, debating competition in various colleges and universities in Delhi, organising a workshop, and publication and release of a document.