Environmental Status Report for Navi Mumbai Municipal Corporation
June 30, 2014 to
July 31, 2014
ESR for NNMC is a consultancy project for structuring and drafting the environmental data sets recorded by NMMC.
Environmental Status Report for Navi Mumbai Municipal Corporation
June 30, 2014 to
July 31, 2014
ESR for NNMC is a consultancy project for structuring and drafting the environmental data sets recorded by NMMC.
Scaling up frameworks and innovative energy interventions
July 23, 2013 to
July 25, 2014
| Sustainable Agriculture
| Energy
| Energy Efficiency
This research project will validate the scaling up assessment tool developed by IFAD with a purpose to build on the existing tool. For this purpose, the IFAD scalability assessment tool will be applied to energy related interventions from IFAD and other partner organizations in India and Africa.
Assessment and Implications of Rationalizing and Phasing Out Fossil-Fuel Subsidies
July 1, 2013 to
July 23, 2014
| Energy
The project is a three country study and TERI will be the India partner for the Global Subsidies Initiative who will lead the project.
This project will have four components: (1) Estimating the downstream subsidies in India on all energy sources; (2) Estimating upstream energy subsidies on one fuel source; (3) Impact analysis of subsidy reform on the energy mix, macro-economy, climate and other factors; (4) Assessment of subsidy projections for different end use segments through an energy systems modelling and scenario building.
Preparation of ESR for Nanded Municipal Corporation
March 1, 2014 to
July 15, 2014
ESR for NWMC for the year 2012-13
Water Quality Report for Maharashtra 2013-14
May 16, 2014 to
June 30, 2014
Illustrative presentation of statistical data recorded by MPCB across 250 water quality monitoring stations in Maharashtra.
Water Quality Report 2012-13
May 13, 2014 to
June 30, 2014
Statistical compilation and illustrative presentation of water quality data recorded by MPCB for 2012-13.
Air Quality Report of Maharashtra 2012-13
January 30, 2014 to
June 30, 2014
Statistical compilation of Data recorded at AAQMS in Maharashtra for the year 2012-13. It shall also include developing Air Quality Index
Assessment of reclaimed ash ponds and fly ash treated agricultural fields
July 1, 2010 to
June 28, 2014
| Sustainable Agriculture
| Environment
| Waste
Assessment of reclaimed ash ponds and fly ash treated agricultural fields with special emphasis on alteration of metal availability in soil, growth pattern of establishment plants, fate of toxic metals therein and subsequent changes in microbial diversity
Feasibility Study for Solar Power Supply to Stations and Level Crossing Gates on Bharuch Dahej Railway Line
September 2, 2013 to
June 23, 2014
| Energy
With the increasing prices of diesel, the cost of electric power becomes high and the need of power can be met through Solar PV system. Therefore, TERI proposes to carry out a feasibility study on the installation of Solar PV power system for the railway stations and level crossing gates on Bharuch Dahej line of Bharuch Dahej Railway Company Limited in Gujarat.
The scope of work for this feasibility study is given as follows:
Study the existing energy scenarios of the railway stations and railway crossing signals;