Upgrading the (CETP) common effluent treatment plant operation at Bithuja
The study aims at providing consultancy for connecting additional washing units to the existing 30 MLD (million litres per day) combined effluent treatment plant at Bithuja. The scope of work includes:
preparation of feasibility report,
preparation of tender documents for pumping station and wastewater conveyance system,
evaluation of tenders and selection of contractors for pumping station and wastewater conveyance system,
approval of drawings submitted by the contractor,
supervision during the construction (as and when required).
preparation of feasibility report,
preparation of tender documents for pumping station and wastewater conveyance system,
evaluation of tenders and selection of contractors for pumping station and wastewater conveyance system,
approval of drawings submitted by the contractor,
supervision during the construction (as and when required).