Setting up of a Bio Methanation plant (TEAM process) 200 kg/day at NTPC-Farakka for the production of biogas and manure from organic solid waste
The main objective of this project is to install a solid waste treatment plant based on TERI's Enhanced Acidification and Methanation (TEAM) technology at NTPC Farakka. This plant would treat 200 kg of organic waste generated from the kitchens. TERI will supply the TEAM equipment, erect, and commission the plant. The biogas produced from the plant will be used for partial replacement of LPG in the kitchen; and the manure will be used for horticulture purposes.