Energy audit at ACC Limited, Jamul
ACC Ltd., (Jamul Cement Works) is producing PPC with an installed capacity of 1.58 million tonnes per annum. The plant is also having a CPP of 25 MW capacity. In the proposed energy audit study, the plant equipment/system such as kiln system, raw mill, coal mill circuits, boilers and turbo-generators, fans and blowers, pumps, air compressors, cooling towers and cooling water systems, and electrical systems (demand side management and transformers) have to be covered for conserving energy.