Status of coal-bed methane in India
17 Jul 2001
TERI Newswire 7(14)
Indigenous resources and potential The coal-bearing formations of India occur in two distinct geological horizons in the Lower Gondwana (Permian) belts of India and the Tertiary sediments (Eocene-Oliocene) of north-eastern India, Rajasthan, Gujarat, and Jammu and Kashmir. Methane gas is entrapped within these formations at a wide range of sub-surface depths. The knowledge of methane occurring with coal beds is as old as the mining itself. However, initially it was treated more as a hazard than a resource. Being highly explosive, coal mines have faced many explosions in the past due to this gas. In China, such explosions are a common occurrence due to lack of proper ventilation in mines. High capacity fans are used to dilute the gas during mining and the mixture is released into the atmosphere. Thus, the resource is not only lost, being a greenhouse gas, it contributes to the global warming. Coal mining is reported to be contributing about nine per cent of the total methane emissions. The total methane emission is 270?449 teragrams (Pande S K. 1996). In the past, methane had oozed out of the boreholes on several occasions during exploration of coal. Many of the mines in Jharia, Ranigunj, Karanpura, and Bokaro coalfields have been found gassy. The Director General of Mines Safety has categorized these mines based on the quantum of methane given off during the process of mining. A large number of our mines are estimated to produce less than 1 m3/tonne of coal produced and are defined as Degree I mines; some of them are Degree II mines giving off 1?10 m3/tonne of output. Only 21 underground mines in Damodar Valley in Jharia, Ranigunj, and Bokaro coalfields are listed as Degree III mines, where the rate of emission exceeds 10 m3/tonne of coal output. A few mines also belong to tertiary deposits in Assam. However, such indicative information is highly inadequate to estimate the potential of CBM (coal-bed methane). The estimation of availability of CBM is a complex, time-consuming, and capital-intensive process. For example, the number of drill holes needed for exploring CBM is 10 times that needed for natural gas. The time and cost involved in pumping out the associated water from CBM drill holes are also high. The quantum of gas is dependent on many parameters and some of them are highly variable. In the last decade, after the realization that methane from coal bed can be gainfully utilized, many agencies and research organizations such as the Central Fuel Research Institute, the Central Mining Research Institute, the Central Mine Planning and Design Institute, the Oil and Natural Gas Corporation, and the Mineral Exploration Corporation have become interested in CBM and are generating useful data. Many private agencies like the Amoco and Reliance also have contributed in this regard. In spite of all this, the data on the estimates are highly varied and the CBM potential of India can at best be summarized as below (Table 1). Table 1 Coal-bed methane resources in India (estimated by various authors) (billion cubic metres) Authors Gondwana basin Tertiary Total Bastia et al. (1995) 837 13 850 * Not reported Source ONGC (2000) Policies/regulation for exploration, exploitation of CBM Investigation on CBM for its commercial exploitation is a comparatively recent phenomenon in India. It was mooted by the Ministry of Coal, Government of India, way back in 1994 when several companies from India and abroad showed keen interest in the subject. The notable ones were Reliance Gas (P) Ltd, Modi Mcenzee, and Amoco, etc. However, though the blocks were allotted to some of them by the Ministry of Coal, it was discovered that the resource came under the preview of the MoPNG (Ministry of Petroleum and Natural Gas). The administrative and bureaucratic wrangle between ministries resulted in a long delay and some of the companies lost interest due to working uncertainty and legal barriers. Finally, the MoPNG was entrusted with the responsibility of framing the policy for the development and use of CBM in India. In the period 1997?2000, the ONGC drilled some test holes and found substantial amount of gas in Bihar in the Parbatpur block. The boreholes were capped after flaring of the gas for some time and search started for the technology for its exploitation and customer for its utilization. In the mean time, the United Nations Development Programme gave a grant of $9.19 million to the Ministry of Coal for the investigation of CBM in Bihar? Bengal coalfields. The Ministry of Coal has since started the work in several mines and adjoining areas. The total project cost is estimated at $19.226 million. The project duration is 5 years and is likely to be completed in 2005. This project is likely to generate useful data on CBM and, after successful completion, is likely to generate more confidence in the prospective investors. After it was decided that the CBM subject will be dealt by the petroleum ministry, a CBM exploitation project was formulated by the Director General of Hydrocarbons with the help of the MoPNG. The project envisaged four phases: Phase I - Exploration, Phase II - Pilot Assessment and Market Confirmation, Phase III - Development, and Phase IV - Production. In the immediate context, only Phase I was to be considered and, to start with, the shallow depth coalbeds of the Lower Gondwanas of the eastern and central parts of India was to be offered. The extent of these beds was of the order of 11,000 km2, made up of: 2800 km2 in the Raniganj, Jharia, East Bokaro and West Bokaro coalfields in the Damodar Valley belt (Jharkhand), and 8200 km2 in the Sohagpur and Satpura coalfields of Central India (Madhya Pradesh). Within these areas, it was proposed to outline 10 blocks, varying in size from 200 to 500 km2, in consultation with the Ministry of Coal and offer them for international competitive bidding. Offers included several fiscal and other incentives for the bidder. However, it took quite some time to do the Biswas (1995) 1000-1500 * * Peters and Jamal (1997) * * 1250 EGI Manual (1997) * * 8000 Reliance Industries Ltd (1999) 428.5 365 793.5 Directorate General of Hydrocarbons (1999) 595.92 939.3 1533.22 Government of Rajasthan * 164 * homework and finalize the project. Finally, the petroleum ministry recently held the first road show in Delhi, promising expeditious finalization of bids and a time-bound commencement of exploration activities for CBM. This was followed by two road shows in the US. The road shows, it is reported, were attended by a large number of representatives from the public sector and some private sector investors. The bid has been floated offering 7 blocks (out of the 10 suggested earlier) for exploration of CBM. The total area of these blocks is 2430 km2 for 6 blocks of Gondwana and 410 km2 of Tertiary lignite with a total estimated CBM resource of above 280 billion cubic metres. These blocks have an estimated reserve of high grade, high-to-medium volatile bituminous/sub-bituminous coal to the extent of 40.58 billion tonnes and 4.8 billion tonnes of lignite. The depth of burial ranges from 100 to 1500 metres for coal and 100 to 400 metres for lignite. The gassiness is estimated to be a minimum of 4 m3/tonne and the maximum varies up to 15 m3/tonne. The main laws governing CBM exploration and production in India are listed below. Oilfields (Regulation and Development) Act, 1948 Petroleum and Natural Gas Rules, 1959 Environment Protection Act, 1986 Arbitration and Conciliation Act, 1996 Income Tax Act, 1961 Customs Act, 1962. The exploration of CBM, as mentioned earlier, is time-consuming and capitalintensive. Unless fiscal and other incentives are in place, the possibility of investors getting interested is remote. Keeping this in mind, many fiscal incentives have been offered in the bid as listed below. No signature bonus No upfront payments No import duties Unincorporated joint ventures permitted No limitation on cost recovery Free to market gas in the domestic market at market-determined prices Securitization of participating interests allowed for raising project finance No bank guarantee required for work programme at development stage 7-year tax holiday Liberal set-off and accelerated deductions for income-tax purposes No ring fencing. The last date for receipt of the bids is 31 August 2001. It is an international competitive bidding where 100% foreign participation has been allowed. The weightages for the main parameters to be used for bid evaluation (under New Exploration Licensing Policy-II) will be based on technical capability (20%), financial strength (10%), work programme (50%), and fiscal package (20%). With the necessary homework done in advance and with transparent procedure being followed by the ministry, it is hoped that the exploration of CBM and later its exploitation and use will become a reality soon. It may not get the status of a major source of energy but surely will supplement the available fuels for power generation and other uses. Its possible recovery is now being recognized as a viable option to enhance the natural gas potential of the country. Reference ONGC. 2000 Presentation on coal-bed methane exploration in India New Delhi: Oil and Natural Gas Corporation Pande S K. 1996 Coal-bed methane: Indian scenario Paper presented at the International Conference on Business and Investment Opportunities in Mining Industry. Organized by the Mining Geological and Metallurgical Institute of India. 16?18 December 1996, New Delhi.